Representative Case Studies

1.M/s. Bhatinda Ceramics Pvt. Ltd., Bhatinda (Punjab):
They gave a contract to Geon for work on a development and design of a 2500 CU M capacity Biogas plant with 250 kW power generation capacity. Geon prepared a detailed project report and design for the project. Geon also got an approval from Ministry of New and Renewable Energy MNRE (Govt. of India) for a subsidy of Rs. 82.5 Lakh for the project. Under the project 5 fixed dome type biogas digesters of 500 CU M capacity each were constructed and commissioned. The project work was supervised by Biogas development and Training Centre (BDTC) Punjab Agriculture University (PAU), Ludhiana as per the direction of the Govt. of India. The total project cost was Rs. 4 Crore. The subsidy was finally released by Govt. of India in financial year March, 2014 after successful commissioning of the project. 

2.M/s. Ghuman Dairy Farm, Gurdaspur, Punjab:
They have set up Biogas based Power Generation Plant. Geon worked on the development and design of the project. Ghuman Dairy has set up two biogas gas plants of 160 CU M capacity each. They have installed Biogas based Generator set of 40 kW capacity. The plant is in rural area. The power produced and the dry Bio-fertilizer is to be used in the dairy farm. The total finance expenditure for the project was Rs. 40.00 Lakh consisting primarily of capital expenditure. Geon has got approval from Ministry of New and Renewable Energy MNRE (Govt. of India) for the subsidy for the project.

3.M/s. Baj Dairy Farm, Punjab:
They had given a contract to Geon for work on a development and design of a 500 CUM capacity Compressed Biogas plant capacity. Geon has prepared a Detailed Project Report and Design of the plant. Geon has also obtained statuary approvals for the project. Geon has also got approval from Ministry of New and Renewable Energy MNRE (Govt. of India) for the subsidy for the project.

4.M/s. Nannu Agro Pvt. Ltd., Kaithal, Haryana:
Nannu has set up Biogas based Power Generation Plant. Geon worked on the development, design and construction of the project. Nannu Agro has set up two biogas gas plants of 200 CU M capacity each. They have installed Biogas based Generator set of 50 kW capacity. The plant is in rural area. The power produced and the dry Bio-fertilizer is to be used in the dairy farm. The total finance expenditure for the project was Rs. 60.00 Lakh consisting primarily of capital expenditure. Geon has got approval from Ministry of New and Renewable Energy MNRE (Govt. of India) for the subsidy for the project

5.M/s. Kartar Dairy Farm, Hosiyarpur, Punjab:
M/s. Kartar Dairy wants to set up Biogas based Power Generation Plant. Geon is working on the development, design and construction of the project. Kartar Dairy wants to set up two biogas gas plants of 200 CU M capacity each. They will install Biogas based Generator set of 50 kW capacity. The plant is in rural area. The power produced and the dry Bio-fertilizer is to be used in the dairy farm. The total finance expenditure for the project will be Rs. 60.00 Lakh consisting primarily of capital expenditure. Geon has got approval from Ministry of New and Renewable Energy MNRE (Govt. of India) for the subsidy for the project.

6.M/s. Taj Poultry Products, Bhiwani, Haryana: 
M/s. Taj Poultry has set up Biogas based Power Generation Plant. Geon worked on the development, design and construction of the project. Taj Poultry has set up three biogas gas plants of 85 CU M capacity each. They have also installed Biogas based Generator set of 36 kW capacity. The plant is in rural area. The power produced and the dry Bio-fertilizer is being used in the dairy farm. The total finance expenditure for the project was Rs. 45.00 Lakh consisting primarily of capital expenditure. Geon has got approval from Ministry of New and Renewable Energy MNRE (Govt. of India) for the subsidy for the project.

7.M/s. Gaurav Poultries, Ambala, Haryana:
M/s. Gaurva Poultries has set up Biogas based Power Generation Plant. Geon worked on the development, design and construction of the project. Gaurav Poultry has set up two biogas gas plants of 200 CUM each and two biogas plants of 300 CU M capacity each. They have installed Biogas based Generator set of 100 kW capacity. The plant is in rural area. The power produced and the dry Bio-fertilizer is being used in the Poultry farm. The total financial expenditure for the project was Rs. 150.00 Lakh consisting primarily of capital expenditure. Geon has got approval from Ministry of New and Renewable Energy MNRE (Govt. of India) for the subsidy for the project.

8.M/s. Hargobind Bio Energy, Patiala, Punjab:
M/s. Hargobind Bio Energy has set up grid connected Biogas based Power Generation Plant. Hargobind Bio Energy has set up one biogas gas plant of 6000 CU M capacity. They have also installed Biogas based Generator set of 635 kW capacity. The plant is in rural area. The power produced is being fed to grid and the dry Bio-fertilizer is being used in the dairy farm. The total finance expenditure for the project was Rs. 600.00 Lakh consisting primarily of capital expenditure. Hargobind Bio Energy, Patiala (Punjab) gave the contract to Geon for work on development, approval, design and construction of Biogas plant. Geon prepared a detailed project report and design for the project. Geon also got an approval for the project and worked on signing a long term power purchase agreement with state utility. The Ministry of New and Renewable Energy, MNRE (Govt. of India) also gave approval for custom duty exemption for the import of machinery for the project. Geon also obtained the approval of the subsidy for the project from the Ministry of New and Renewable Energy, MNRE (Govt. of India) for a subsidy of around Rs. 100 Lakh. Geon is also working for validation and verification of Gold Standard carbon credits for the project.

9.M/s. Sheer Dairy Pvt. Ltd, Karnal, Haryana:
M/s. Sheer Dairy has set up Biogas based Power Generation Plant. Geon worked on the development, design and construction of the project. Sheer Dairy has set up one biogas gas plant of 200 CUM. They have installed Biogas based Generator set of 24 kW capacity. The plant is in rural area. The power produced and the dry Bio-fertilizer is being used in the farm. The total finance expenditure for the project was Rs. 25.00 Lakh consisting primarily of capital expenditure. Geon has got approval from Ministry of New and Renewable Energy MNRE (Govt. of India) for the subsidy for the project.

10.M/s. Himalayan Creamery Pvt. Ltd. Punjab:
M/s. Himalayan creamery has set up Biogas based Power Generation Plant. Geon worked on the development, design and construction of the project. They have set up one biogas gas plant of 200 CUM. They have installed Biogas based Generator set of 24 kW capacity. The plant is in rural area. The power produced and the dry Bio-fertilizer is being used in the farm. The total finance expenditure for the project was Rs. 25.00 Lakh consisting primarily of capital expenditure. Geon has got approval from Ministry of New and Renewable Energy MNRE (Govt. of India) for the subsidy for the project.

11.M/s. Gitwako Farms (India) Pvt. Ltd., Haryana:
M/s. Gitwako Farms has set up Biogas based Power Generation Plant. Geon worked on the development, design and construction of the project. They have set up one biogas gas plant of 350 CUM. They have installed Biogas based Generator set of 40 kW capacity. The plant is in rural area. The power produced and the dry Bio-fertilizer is being used in the farm. The total finance expenditure for the project was Rs. 40.00 Lakh consisting primarily of capital expenditure. Geon has got approval from Ministry of New and Renewable Energy MNRE (Govt. of India) for the subsidy for the project.

12.M/s. Anwesha Enterprises Pvt. Ltd., West Bengal:
M/s. Anwesha Enterprises plans to set up a Compressed Biogas Plant. They want to set up one biogas gas plant of 2000 CU M capacity. The plant will be in rural area. The biogas produced will be sold locally. The dry Bio-fertilizer will be used in the farm. The total financial expenditure for the project will be Rs. 350.00 Lakh consisting primarily of capital expenditure. Anwesha has given the contract to Geon for work on development, approval, design and construction of Biogas plant. Geon has also prepared a detailed project report and design for the project. 

13.M/s. Shree Krishna Bio Power, Haryana:
M/s. Shree Krishna wants to set up grid connected Biogas based Power Generation Plant. They will set up one biogas gas plant of 10000 CU M capacity. They will also install Biogas based Generator set of 1067 kW capacity. The plant is in rural area. The power produced will be fed to grid and the dry Bio-fertilizer will be used in the farms. The total finance expenditure for the project will be Rs. 1250.00 Lakh consisting primarily of capital expenditure. Shree Krishna gave the contract to Geon for work on development, approval, design and construction of Biogas plant. Geon prepared a detailed project report for the project. Geon will also get an approval for the project and is working on signing a long term power purchase agreement with state utility.

14.M/s. KDS Green energy Pvt. Ltd., Punjab:
M/s. KDS green wants to set up grid connected Biogas based Power Generation Plant. They will set up one biogas gas plant of 10000 CU M capacity. They will also install Biogas based Generator set of 1067 kW capacity. The plant is in rural area. The power produced will be fed to grid and the dry Bio-fertilizer will be used in the farms. The total finance expenditure for the project will be Rs. 1250.00 Lakh consisting primarily of capital expenditure. KDS Green gave the contract to Geon for work on development, approval, design and construction of Biogas plant. Geon prepared a detailed project report for the project. Geon will also get an approval for the project and is working on signing a long term power purchase agreement with state utility. 

15.M/s. PRAVASH SHARMA, NEPAL:
They plan to set up a Compressed Biogas Plant. They want to set up one biogas gas plant of 3500 CU M capacity. The plant will be in rural area. The biogas produced will be sold locally. The dry Bio-fertilizer will be used in the farm. The total finance expenditure for the project was Rs. 600.00 Lakh consisting primarily of capital expenditure. They have given contract to Geon for work on development, approval, design and construction of Biogas plant. Geon prepared a detailed project report and design for the project.

16.M/s. ISKCON, Govardhan:
M/s. ISKCON is setting up a Biogas based Power Generation Plant. Geon is working on the development, design and construction of the project. They are setting up one biogas gas plant of 200 CUM. They will install Biogas based Generator set of 24 kW capacity. The plant is in rural area. The power produced and the dry Bio-fertilizer will be used in the farm. The total finance expenditure for the project will be Rs. 25.00 Lakh consisting primarily of capital expenditure. Geon will get approval from Ministry of New and Renewable Energy MNRE (Govt. of India) for the subsidy for the project.

17.M/s. RK the Aluminium People, Varanasi:
M/s. RK the Aluminum people is setting up a Biogas Plant in a UP Govt. sponsored Gowshala in Varanasi. Geon is working on the development, design and construction of the project. They are setting up one biogas gas plant of 180 CUM. They will use Biogas for cooking. The plant is in rural area. The dry Bio-fertilizer will be used in the farm. The total finance expenditure for the project will be Rs. 22.00 Lakh consisting primarily of capital expenditure. 

18.M/s. Chhattisgarh State Livestock Development Agency. Raipur:
M/s. Chhattisgarh State Livestock Development Agency. Raipur is setting up a Biogas Power Plant in a Govt. sponsored project in Central Semen Station Anjora, Durg. Geon is working on the development, design and construction of the project. They are setting up one biogas gas plant of 75 CUM. They will use Biogas for power generation. The plant is in rural area. The dry Bio-fertilizer will be used in the farm. The total finance expenditure for the project will be Rs. 25.00 Lakh consisting primarily of capital expenditure. 

Request Callback

LATEST NEWS

Special Discount on Industrial Project Consultancy
You can reach out to us on 9811566636 / 9717112077 for providing Consulting, Technology, Outsourcing, and Industrial project services.