1. CAPTIVE BIOGAS POWER PLANT:

A dairy farm owner, Poultry farm owner, Goshala can set up a biogas-based power plant with 12 kW to 100 kW capacity. The plant will have to be installed as a captive power plant. A Biogas plant will have to be installed to produce 100 CUM to 1000 CUM biogas per day.
2. COMPRESSED BIOGAS PLANT:

Thermal application is done by filling the compressed biogas in cylinders and then taking those cylinders to the application site. The main objective of the project is to set up a compressed biogas plant to sell the Bio CNG to the local users or as an automotive fuel. The plant also produces organic manure in large quantity which can be sold in the open market. Bio CNG is in good demand. Similarly, organic manure is always in short supply. It is needed for fruits and vegetables and horticulture. The plant can be set up in a place where cow dung and Poultry droppings or Press Mud or Biomass waste or Napier Grass is available in large quantities.
3. LARGE SIZE BIOGAS POWER PLANT

Electrical power is generated at
the biogas generation site. The plant size can have a capacity of a few MW. The
main objective of the project is to set up a biogas based power plant to sell
the power to the grid via a long term PPA. The power produced from biogas and
fed to the grid gets preferential rates. Biogas plant also produces organic
manure in large quantity which can be sold in the open market. Any amount of
power can be fed to the grid. Similarly, organic manure is always in short
supply. It is needed for fruits and vegetables and horticulture. The plant can
be set up in a place where cow dung and Poultry droppings or Press Mud or
Biomass waste is available in large quantities.

4. BIOMASS GASIFIER POWER PLANT
Electrical power is generated at the Gasifier power plant site. The plant size can be from a few kW to a few MW. The main objective of the project is to set up a Biomass-based Gasifier based power plant to sell the power to the grid via a long term PPA or use it under captive conditions. The power produced from biogas and fed to the grid gets preferential rates. The plant can be set up in a place where the biomass of any type is available in a large quantity.
